Laserfiche WebLink
There are 0.2 acres of disturbance associated with this minor revision. <br />MR -105 Reclaim Additional Disturbed Area <br />Item <br />Seed <br />50% Re -Seed <br />Quantity <br />0.2 <br />0.1 <br />Unit <br />AC <br />AC <br />614.92 <br />502.32 <br />Total direct cost <br />$123 <br />$50 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance and bond @ 13.07% <br />$16 <br />$7 <br />Contract = Direct+ Overhead <br />$256 <br />$174 <br />Engineering 4.25% of Contract <br />$11 <br />$7 <br />Reclamation management 5.0% of Contract <br />1 $13 <br />$9 <br />Estimated bond <br />1 $280 <br />$190 <br />MR -105 Exhibit 28- Page 229 Revised 01/12/12 <br />