Laserfiche WebLink
A 100 foot long, 50 foot wide office shop will be constructed west of the preparation plant. <br />MR -105 Office Shop <br />Item <br />Shop <br />Cone Slab <br />Length ft <br />100 <br />100 <br />Width ft <br />50 <br />50 <br />Height ft <br />18 <br />Quantity <br />90,000 <br />.5,000 <br />Units <br />CF <br />SF <br />Unit cost <br />0.18 <br />1.61 <br />Total direct cost <br />$16,200 <br />$8,050 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond @ 13.07% <br />$2,117 <br />$1,052 <br />Contract = Direct + Overhead <br />$18,434 <br />$9,219 <br />Engineering 4.25% of Contract <br />$783 <br />$392 <br />Reclamation management 6.0% of Contract <br />$922 <br />$461 <br />Estimated bond <br />$20,140 <br />$10,072 <br />Total Estimated Bond <br />$30,212 <br />A 12 foot long, 12 foot wide pump house will be constructed south of pond 1. <br />MR -105 Pump House <br />Item <br />Pump House <br />Conc Slab <br />Length ft <br />12 <br />12 <br />Width ft <br />12 <br />12 <br />Height ft <br />10 <br />Quantity <br />1,440 <br />144 <br />Units <br />CF <br />SF <br />Unit cost <br />0.18 <br />1.61 <br />Total direct cost <br />$259 <br />$232 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond @ 13.07% <br />$34 <br />$30 <br />Contract = Direct + Overhead <br />$410 <br />$379 <br />Engineering 4.25% of Contract <br />$17 <br />$16 <br />Reclamation management 5.0% of Contract <br />$21 <br />$19 <br />Estimated borid <br />$448 <br />$414 <br />Total Estimated Bond <br />$862 <br />MR -105 Exhibit 28- Page 228 Revised 01/12/12 <br />