My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The power line will be extended 550 feet. The cell repeater will be mounted on a power pole so reclamation of the <br />cell repeater is included in the cost of the power line removal. <br />Remove Power Line Extension <br />Item <br />Seed <br />50% Re -Seed <br />12,470 Volt Lineal Feet of Extension <br />550 <br />Feet <br />Cost per Lineal Foot for Removal <br />5.58 <br />AC <br />Total direct cost <br />$3,069 <br />502.32 <br />Job supervision hours <br />2 <br />$201 <br />Job supervision cost <br />$117 <br />2 <br />Profit, insurance, and bond @ 13.07% <br />$401 <br />$117 <br />Contract = Direct + Overhead <br />$3,587 <br />$26 <br />Engineering 4.25% of Contract <br />$152 <br />$344 <br />Reclamation management 5.0% of Contract <br />$179 <br />$15 <br />Estimated bond <br />$3,919 <br />$17 <br />Reclaim Additional Disturbed Area <br />Item <br />Seed <br />50% Re -Seed <br />Quantity <br />0.8 <br />0.4 <br />Unit <br />AC <br />AC <br />Cost per Acre <br />614.92 <br />502.32 <br />Total direct cost <br />$492 <br />$201 <br />Job supervision hours <br />2 <br />2 <br />Job supervision cost <br />$117 <br />$117 <br />Profit, insurance, and bond @ 13.07% <br />$64 <br />$26 <br />Contract = Direct + Overhead <br />$673 <br />$344 <br />Engineering 4.25% of Contract <br />$29 <br />$15 <br />Reclamation management 5.0% of Contract <br />$34 <br />$17 <br />Estimated bond <br />$736 <br />$376 <br />Remove Culverts <br />Item <br />Quantity <br />Unit Price <br />Cost <br />Remove 21" Diameter Culvert C53 <br />20 <br />3.28 <br />$65.60 <br />Remove 42" Diameter Culvert C75 <br />60 <br />3.28 <br />$96.80 <br />Remove 42" Diameter Culvert C76 <br />40 <br />3.28 <br />$131.20 <br />Total direct cost <br />$393.60 <br />Job supervision hours <br />4 <br />Job supervision cost <br />234.24 <br />Profit, insurance, and bond @ 13.07% <br />51.44 <br />Contract = Direct + Overhead <br />679.28 <br />Engineering 4.25% of Contract <br />28.87 <br />Reclamation management 5.0% of Contract <br />33.96 <br />Estimated bond <br />$742.12 <br />TR -62 Exhibit 28- Page 222 Revised 03/12/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.