My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-31_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-08-31_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:17 PM
Creation date
9/10/2012 9:02:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
8/31/2012
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97 MR101)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Elk Coal Company <br />Permit C- 1981 -012 <br />Install Cell Repeater <br />TR -62 provides for the construction of facilities necessary to install a cell repeater on a point <br />high above the mine facilities. Associated facilities include constructing a power line to the cell repeater <br />and constructing necessary travel ways. The cell repeater is mounted on a long power pole. A light use <br />road to access slurry wells S2 and S3 is also included in this revision. <br />This document estimates the bonding required to remove the power line and reclaim a <br />small disturbed area. <br />TR -62 Cell Repeater <br />Total direct cost <br />$4,155 <br />Job supervision hours <br />10 <br />Job supervision cost <br />$586 <br />Profit, insurance, bond <br />$543 <br />Contract <br />$5,284 <br />Engineering <br />$225 <br />Reclamation management <br />$264 <br />Estimated bond <br />$5,773 <br />TR -62 Exhibit 28- Page 221 Revised 03/12/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.