My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-07_INSPECTION - C1981041
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981041
>
2012-09-07_INSPECTION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:07:46 PM
Creation date
9/10/2012 8:11:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
9/7/2012
Doc Name
Inspection Report
From
DRMS
To
Tonya Hammond
Inspection Date
8/30/2012
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 30, 2012 C- 1981 - 041 /Roadside Portals MPB <br />Ditch at the North Portal to remove the 36 -inch Flume (Photograph No. 5). The Flume was crushed and taken to <br />the XCEL Power Plant scrap metal dump and disposed of properly. To date (since this inspection was conducted) <br />Ponds 6, 10, 11, and 13 have been backfilled and graded and topsoil has been redistributed. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The work completed to date by CSI Contractors looks very good and was performed according to the approved <br />reclamation plan. SCC has also done an excellent job in managing the construction activities on -site. Remaining <br />work to be completed includes construction of permanent drainages at the North Portal area and seeding and <br />mulching all final reclaimed areas at the CRDA41 and 42 and North Portal areas. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />All of the topsoil for this reclamation work came from Topsoil Pile 41 (see Photograph No. 6). There was <br />sufficient topsoil in Pile 41 to complete the reclamation of these ponds and all other related reclamation work. <br />With PR -5 SCC was approved to leave the remaining portion of Topsoil Pile 2 at the North Portal area in place <br />due to guy wire anchors supporting transmission power poles buried in the remnant of Topsoil Pile 2. The pile is <br />stable and well vegetated; it blends into the surrounding terrain reasonably well, and does not impede the drainage <br />pattern of the surrounding terrain. <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 7 <br />