Laserfiche WebLink
Page 4 <br /> either be secured with a gate if reserves indicate future <br /> development may be possible, or the adit will be covered <br /> and smoothed over with excavated talus if reserves do not <br /> warrant future development. In any case, a wide spot in the <br /> road will remain. No attempt at revegetation will be made <br /> as the site is entirely underlain by unvegetated talus and <br /> reclamation materials will be the same. <br /> Question 8 : Will water used in drilling create any <br /> potential erosion upon release of unused portions? <br /> Response: Drill water will be piped to the site from an <br /> existing upslope adit which currently discharges to the <br /> talus slope. The talus is very coarse, measuring up to many <br /> feet in diameter . No erosion has occurred at the existing <br /> adit. Only as much water as is needed for drilling will be <br /> brought down to the exploration adit , and should any unused <br /> portion be discharged no erosion will result. <br /> Question 9: Is it correct to assume that the Prospect <br /> Notice of Intent , P-77-093 should be terminated? <br /> Response: Yes, Prospect Notice of Intent P-77-093 should be <br /> terminated. No activities outlined in that Notice were ever <br /> conducted, nor are there plans to do so. <br /> If you wish additional information on any of these responses <br /> please call at your convenience. <br /> Sincerely, <br /> Frank W. Bergstrom <br /> Environmental Manager <br /> Enclosure <br /> FWB/lb <br /> cc: Mike Stanton <br />