Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />There is no topsoil in the project area (see previous NOI P- 2011 -010 and modification MD- <br />vi for details). <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drilling is included in the previous NOI and modification (P- 2011 -010 modification MD -01, <br />respectively) and does not apply to this modification. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Upon completion of the Equity Underground project, the two proposed rock piles will be <br />recontoured to provide for adequate drainage and will be covered in talus from the slope <br />p <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />Road reclamation is included in the previous NOI and modification (P- 2011 -010 <br />modification MD -01, respectively) and will not change with this modification. <br />