Laserfiche WebLink
August 28, 2012 C-1994-082/Yoast Mine SLB <br /> Recent storms carried sediment into the lower reaches of YPM 6-3, covering the outlets of the french drains at the <br /> base of the Pond 012 slide. These outlets should be cleared to prevent water backing up and saturating the <br /> unstable slopes;this should be done before the end of this construction season to ensure adequate drainage of <br /> snowmelt in the spring. <br /> DOCUMENTS RECEIVED DMRs and quarterly pond inspections for 2nd qtr 2012. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> goal <br /> el <br /> Pond 011A Pond 010 <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 7 <br />