My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-04-15_GENERAL DOCUMENTS - M1977378
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977378
>
1986-04-15_GENERAL DOCUMENTS - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2020 11:37:40 AM
Creation date
8/29/2012 7:46:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
4/15/1986
Doc Name
High Priority Management Plan
From
MLRD
To
File
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGH PRIORITY MANAGEMENT PLAN - 2 - March 28, 1986 <br /> 3. Final reclamation of all the tailings piles: <br /> A. Stabilization; <br /> B. Hydrologic balance; <br /> C. Final configuration; <br /> D. Revegetation; <br /> E. Reclamation Schedule. <br /> 4. Final reclamation of site: <br /> A. Water treatment/hydrologic balance; <br /> B. Land configuration; <br /> C. Revegetation; <br /> D. Faci1i ties,removal <br /> ; <br /> E. Reclamation schedule. <br /> 5. Refuse disposal : <br /> A. Hydrologic balance; <br /> B. Specifications; <br /> C. Reclamation. <br /> 6. Implementation of Revegetation test plots on tailings piles: <br /> A. Tailings analyses (physical and chemical ); <br /> B. Experimental design; <br /> C. Implementation; <br /> D. Monitoring of newly and previously implements plots; <br /> E. Analysis and results submitted as soon as available. <br /> 7. Monitoring program: <br /> A. Tails effluent monitoring schedule; <br /> B. Sludge disposal groundwater monitoring schedule; <br /> C. Evaluate the need for additional monitoring programs. <br /> 8. New maps depicting boundaries, etc. <br /> 9. Evaluation of Financial Warranty. <br /> A consolidated permit reflecting present and proposed operations <br /> will be available. Old material should be archived. <br /> II. Site Inspection <br /> 1 . Inspect entire site: American Tunnel ; Terry Tunnel ; Lake Emma <br /> site; Mill complex; mill site; tailings ponds; waste treatment <br /> facilities; discharge points; current monitoring locations, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.