Laserfiche WebLink
HIGH PRIORITY MANAGEMENT PLAN - 2 - March 28, 1986 <br /> 3. Final reclamation of all the tailings piles: <br /> A. Stabilization; <br /> B. Hydrologic balance; <br /> C. Final configuration; <br /> D. Revegetation; <br /> E. Reclamation Schedule. <br /> 4. Final reclamation of site: <br /> A. Water treatment/hydrologic balance; <br /> B. Land configuration; <br /> C. Revegetation; <br /> D. Faci1i ties,removal <br /> ; <br /> E. Reclamation schedule. <br /> 5. Refuse disposal : <br /> A. Hydrologic balance; <br /> B. Specifications; <br /> C. Reclamation. <br /> 6. Implementation of Revegetation test plots on tailings piles: <br /> A. Tailings analyses (physical and chemical ); <br /> B. Experimental design; <br /> C. Implementation; <br /> D. Monitoring of newly and previously implements plots; <br /> E. Analysis and results submitted as soon as available. <br /> 7. Monitoring program: <br /> A. Tails effluent monitoring schedule; <br /> B. Sludge disposal groundwater monitoring schedule; <br /> C. Evaluate the need for additional monitoring programs. <br /> 8. New maps depicting boundaries, etc. <br /> 9. Evaluation of Financial Warranty. <br /> A consolidated permit reflecting present and proposed operations <br /> will be available. Old material should be archived. <br /> II. Site Inspection <br /> 1 . Inspect entire site: American Tunnel ; Terry Tunnel ; Lake Emma <br /> site; Mill complex; mill site; tailings ponds; waste treatment <br /> facilities; discharge points; current monitoring locations, etc. <br />