My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 3:04:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, JULY 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec-�� <br />used to place small lifts of overburden fill into the working and bucket tamp the material. This was <br />performed due the working being too narrow for the CAT 563 vibratory smooth drum compactor to <br />be used for compaction. <br />The crown pillar at Underground Working #4074 was removed using a CAT 330 excavator and <br />observation was performed by an AMEC field representative. The working was completely <br />removed during excavation and competent rock was encountered. A CAT 330 excavator was <br />used to place small lifts of overburden fill into the working and bucket tamp the material. This was <br />performed due the working being too narrow for the CAT 563 vibratory smooth drum compactor to <br />be used for compaction. <br />III) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />B) Geomembrane Installation <br />No work performed during the week. <br />C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Exposure <br />No work performed during the week. <br />E) Geomembrane Acceptance <br />No work performed during the week. <br />IV)Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. Silt <br />fence was placed at the toe of the Mill Site footprint and the toe of the Topsoil stockpile. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to overburden fill <br />placement. Subgrade temperatures were monitored prior to fill placement. <br />AMEC observed excavation and placement of overburden fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed slope contouring of placed overburden fill for the Mill Site Earthworks project. <br />AMEC observed remediation of UG #4007. <br />AMEC observed remediation of UG #4073. <br />MEW Weekly Report WE 07.14.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.