WTIAm <br />Ime <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />C) Slope Contouring <br />Slope contouring was performed using various CAT dozers and a John Deere 850 excavator. <br />Material generated during slope contouring was placed as overburden fill at the top of the slope. <br />D) Soil Liner Fill (SLF) <br />Soil Liner Fill processing was paused due to saturated stockpiles and slick work areas. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />8,516 <br />22,578 <br />DCF processing is temporarily paused <br />Total <br />1 8,516 <br />1 22,578 <br />DCF processing is temporarily paused <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Wseek <br />Cumulative <br />Comments <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />F) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />No work performed during the week. <br />B) Drilling <br />No work performed during the week. <br />C) Remediation <br />Remediation of Underground Working #4007 was performed with the placement of a three -layer <br />geogrid cap extending 15 feet from the working location identified during confirmatory drilling. <br />Approximately 36,342 square feet (12,114 square feet per layer) of geogrid was placed and <br />accepted by an AMEC field representative. Approximately 480 cubic yards (240 cubic yards per <br />layer) of select structural fill was used between geogrid layers in 6 -inch compacted lifts. <br />Approximately 481 cubic yards of select structural fill was used above the final layer of geogrid in <br />a 12 -inch compacted lift. Prior to compaction, the select structural fill material was moisture <br />conditioned using a CAT 773 water truck. Compaction of the select structural fill was then <br />performed using a 10 -ton smooth drum compactor using the static method. <br />The crown pillar at Underground Working #4073 was removed using a CAT 330 excavator and <br />observation was performed by an AMEC field representative. The working was completely <br />removed during excavation and competent rock was encountered. A CAT 330 excavator was <br />MEW Weekly Report WE 07.14.2012 <br />