"Wil M, <br />IV)Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed clear and grub activities performed by Seedmasters within the Mill Site Earthworks <br />project. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to overburden fill <br />placement. Subgrade temperatures were monitored prior to fill placement. <br />AMEC observed excavation and placement of overburden fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed slope contouring of placed overburden fill for the Mill Site Earthworks project. <br />AMEC observed remediation of UG #4007. <br />AMEC observed remediation of UG #4008 (Morning Glory). <br />AMEC observed remediation of UG#4024. <br />AMEC observed remediation of UG#4025. <br />AMEC observed remediation of UG#4044. <br />AMEC observed remediation of UG#4071. <br />AMEC observed confirmatory drilling at UG #4073. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4073 <br />AMEC observed confirmatory drilling at UG #4074. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade preparation for fill placement for the Mill Site Earthworks project. <br />MEW Weekly Report WE 04.07.2012 <br />