My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (14)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:50:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, APRIL 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L"11 =M <br />Grouting of "miss" (non -void) confirmatory drill holes was performed at Underground Working <br />#4073. A grout pump and laborers were used to place bentonite grout into the "miss" drill holes. <br />C) Remediation <br />A John Deere 850 excavator was used to excavate the blasted material from Underground <br />Working #4007. The working was excavated to the limits of the excavator. Backfilling was then <br />performed with coarse shaft backfill. Due to access, the material as placed in small lifts and <br />bucket tamped using the excavator. This was performed preparing for geogrid placement and <br />activities were observed by an AMEC field representative. <br />A concrete plug was placed at Underground Working #4008 (Morning Glory). Approximately 40 <br />cubic yards of approved concrete from Transit Mix was placed in the previously approved plug, <br />shaped in the shaft. The concrete placement was observed by an AMEC field representative. <br />Remediation of Underground Working #4024 was performed placing the concrete plug in the <br />working. Seven feet of cemented rock fill was placed on top of the previously placed concrete. An <br />AMEC field representative observed cemented rock fill. <br />Remediation of Underground Working #4025 was performed placing the concrete plug in the <br />working. Seven feet of cemented rock fill was placed on top of the previously placed concrete. An <br />AMEC field representative observed cemented rock fill. <br />Remediation of Underground Working #4044 was performed placing the concrete plug in the <br />working. Seven feet of cemented rock fill was placed on top of the previously placed concrete. An <br />AMEC field representative observed cemented rock fill. <br />A concrete plug was placed at Underground Working #4071. Approximately thirty cubic yards of <br />approved concrete from Transit Mix was placed in the previously approved plug, shaped in the <br />shaft. The concrete placement was observed by an AMEC field representative. <br />Testing of the concrete was performed by an AMEC field representative. Slump, air entrainment, <br />temperature testing was performed with results passing. One set of nine 4 "x 8" cylinders were <br />cast for laboratory compressive strength testing. <br />D) Structures <br />No work performed during the week. <br />III) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Anchor Trench <br />No work performed during the week. <br />Q Geomembrane Exposure <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />MEW Weekly Report WE 04.07.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.