"Wilm <br />AMEC observed excavation and placement of overburden fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed slope contouring of placed overburden fill for the Mill Site Earthworks project. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4001. <br />AMEC observed remediation of UG #4007. <br />AMEC observed confirmatory drilling at UG #4008. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4008. <br />AMEC observed remediation of UG#4024. <br />AMEC observed remediation of UG#4025. <br />AMEC observed remediation of UG#4044. <br />AMEC observed confirmatory drilling at UG #4047. <br />AMEC observed confirmatory drilling at UG #4052. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4052. <br />AMEC observed confirmatory drilling at UG #4071. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4071. <br />AMEC observed remediation of UG#4071. <br />AMEC observed confirmatory drilling at UG #4073. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade preparation for fill placement for the Mill Site Earthworks project. <br />Continue slope contouring for the Mill Site Earthworks project. <br />Continue overburden fill placement for the Mill Site Earthworks project. <br />Continue confirmatory drilling of Underground Workings for the Mill Site Earthworks project. <br />Continue grouting "miss" (non -void) holes from confirmatory drilling. <br />Continue investigation and remediation of Underground Workings for the Mill Site Earthworks project. <br />Continue structure removal /relocation for the Mill Site Earthworks project. <br />Continue construction of the catch berm and storm water channel for the Mill Site Earthworks project. <br />MEW Weekly Report WE 03.31.2012 <br />