II) Underground Mine Workings <br />A) Discovery <br />During cut to fill two Underground Workings were encountered. The locations were surveyed by <br />Ames and given a project designations of UG #4069 and #UG4070. <br />B) Drilling <br />Confirmatory drilling was performed at Underground Working #4001. A drill pattern was set out by <br />an AMEC field representative. Eleven holes were drilled encountering six voids. An approximate <br />total of 550 lineal feet was drilled. As -built survey of the drill holes was performed by Ames. <br />Confirmatory drilling was performed at Underground Working #4031. A drill pattern was set out by <br />an AMEC field representative. Twenty -six holes were drilled encountering thirteen voids. An <br />approximate total of 1,300 lineal feet was drilled. As -built survey of the drill holes was performed <br />by Ames. <br />Confirmatory drilling was performed at Underground Working #4048. A drill pattern was set out by <br />an AMEC field representative. Thirteen holes were drilled encountering three voids. An <br />approximate total of 650 lineal feet was drilled. As -built survey of the drill holes was performed by <br />Ames. <br />Confirmatory drilling was performed at Underground Working #4052. A drill pattern was set out by <br />an AMEC field representative. Twelve holes were drilled encountering ten voids. An approximate <br />total of 600 lineal feet was drilled. As -built survey of the drill holes was performed by Ames. <br />Confirmatory drilling was performed at Underground Working #4058. A drill pattern was set out by <br />an AMEC field representative. Sixteen holes were drilled encountering nine voids. An <br />approximate total of 800 lineal feet was drilled. As -built survey of the drill holes was performed by <br />Ames. <br />Grouting of missed (non -void) confirmatory drill holes was performed at Underground Workings <br />#4007, 4051, and #4053. A grout pump and laborers were used to place bentonite grout into the <br />"miss" drill holes. <br />Q Remediation <br />Remediation of Underground Working #4000 was performed with the placement of a three -layer <br />geogrid cap extending 15 feet from the working location identified during confirmatory drilling. <br />Approximately 25,200 square feet of geogrid was placed and accepted by an AMEC field <br />representative prior to select structural fill placement. Approximately 365 cubic yards of select <br />structural fill was then placed over the previously installed geogrid layer in a 6 -inch compacted lift. <br />Prior to compaction the select structural fill material was moisture conditioned using a CAT 773 <br />water truck. Compaction of the select structural fill was then performed using a 10 -ton smooth <br />drum compactor using the static method. Four nuclear density tests were performed with results <br />passing. Moisture - density relations were performed in accordance with ASTM D698 -07. <br />Remediation of Underground Working #4016 continued as the fill progressed in the area. A CAT <br />345 excavator was used to place small lifts of overburden fill into the working and bucket tamp the <br />material. This was performed due the working being too narrow for the CAT 563 vibratory smooth <br />drum compactor to be used for compaction. Remediation will continue as the overburden fill <br />placement progresses in the area. <br />MEW Weekly Report WE 03.17.2012 <br />