My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:46:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, MARCH 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: March 17, 2012 <br />Reporting Period: 3/11/2012 through 3/17/2012 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />N <br />N <br />N <br />N <br />N <br />N <br />N <br />D = Day Shift <br />N = <br />Night Shift <br />Project No.: 84201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day /Night <br />Ambient Temperature Range (F): Low: 23 °F to 33 °F ( + / -) High: 46 °F to 54 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />Ames: No work activities were performed during dayshift on Sunday (3/11/2012) due to snowfall and <br />slick haul routes. Work activities resumed at the beginning proceeding night shift. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Topsoil Stripping <br />No work performed during the week. <br />B) Clear and Grub <br />Chippings from clear and grub activities were loaded into CAT 40 -ton articulating haul trucks and <br />hauled to the topsoil stockpile designated by CC &V. <br />Q Subgrade Preparation <br />Subgrade preparation was performed prior to overburden fill placement in the areas shown on <br />Figure 1. Various CAT dozers were used to rip the existing surface to a depth of at least 6 inches. <br />Moisture conditioning of the subgrade was performed (when necessary) using a CAT 773 water <br />truck. Compaction was performed using a 10 -ton vibratory smooth drum compactor passing over <br />the entire subgrade surface at least four times. The subgrade was inspected and approved by an <br />AMEC field representative, prior to fill placement. <br />In most areas, excluding flat areas were fills are started, the subgrade is keyed into as the fill <br />progress. This is due to steep slopes that are adjacent to most fill areas. In this instance, the <br />subgrade is inspected for organics and debris by an AMEC field representative prior to fill <br />placement (keying into the subgrade). <br />MEW Weekly Report WE 03.17.2012 <br />