My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:42:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, FEBRUARY 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— ®� <br />• <br />AMEC observed confirmatory drilling at UG #4020. <br />AMEC observed investigation and remediation of UG #4023. <br />AMEC observed grouting of "miss" (non -void) holes at UG #4024. <br />AMEC observed grouting of "miss" (non -void) holes at UG #4025. <br />AMEC observed grouting of "miss" (non -void) holes at UG#4026. <br />AMEC observed confirmatory drilling at UG #4029. <br />AMEC observed confirmatory drilling at UG #4031. <br />AMEC observed investigation and remediation of UG #4000. <br />AMEC observed investigation and remediation of UG #4038. <br />AMEC observed investigation of UG #4039. <br />AMEC observed investigation of UG#4040. <br />AMEC observed investigation and remediation of UG #4041. <br />AMEC observed investigation and remediation of UG #4042. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process <br />area. This was performed during night shift. <br />AMEC observed the construction of a catch berm and the storm water channel at the toe of the Mill Site <br />fill. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue clear and grub activities for the Mill Site Earthworks project. <br />Continue stripping topsoil for the Mill Site Earthworks project. <br />Continue subgrade preparation for fill placement for the Mill Site Earthworks project. <br />Continue slope contouring for the Mill Site Earthworks project. <br />Continue structural fill placement for the Mill Site Earthworks project. <br />Continue confirmatory drilling of Underground Workings for the Mill Site Earthworks project. <br />Continue grouting "miss" (non -void) holes from confirmatory drilling. <br />MEW Weekly Report WE 02.04.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.