Laserfiche WebLink
Twlime <br />Relocation of the structure at Underground Working #4043 (The Wedge) was started by Frontier <br />Environmental Services Inc. Ames constructed access to the area for frontier using a CAT D -8 <br />dozer. <br />III) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Anchor Trench <br />No work performed during the week. <br />C) Geomembrane Exposure <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />IV) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed clear and grub activities performed by Seedmasters within the Mill Site Earthworks <br />project. <br />AMEC observed stripping and relocation of topsoil from within the Mill Site Earthworks project. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to structural fill <br />placement. Subgrade temperatures were monitored prior to fill placement. <br />AMEC observed excavation and placement of structural fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed remediation of UG #4000. <br />AMEC observed confirmatory drilling at UG #4007. <br />AMEC observed Frontier Environmental Services Inc. relocate the structure at UG #4008. <br />AMEC observed remediation of UG #4012. <br />AMEC observed confirmatory drilling at UG #4020. <br />MEW Weekly Report WE 02.11.2012 <br />