Laserfiche WebLink
• <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed clear and grub activities performed by Seedmasters within the Mill Site Earthworks <br />project. <br />AMEC observed stripping of topsoil from within the Mill Site Earthworks project. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to structural fill <br />placement. Subgrade temperatures were monitored prior to any fill placement. <br />AMEC observed excavation and placement of structural fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed confirmatory drilling at UG #4000. <br />AMEC observed investigation and remediation of UG #4004. <br />AMEC observed the discovery and cleaning out of UG #4006. <br />AMEC observed confirmatory drilling at UG #4006. <br />AMEC observed Frontier Environmental Services Inc. relocate the structure at UG #4008. <br />AMEC observed investigation and remediation of UG #4009. <br />AMEC observed investigation UG #4010. <br />AMEC observed investigation UG #4011. <br />AMEC observed investigation UG #4012. <br />AMEC observed investigation UG #4013. <br />AMEC observed investigation UG#4014. <br />AMEC observed investigation UG #4015. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process <br />area. This was performed during night shift. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />MEW Weekly Report WE 01.07.2012 <br />