"Wilm"le- <br />Underground Working #4013 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The previously logged location was staked by the <br />Ames surveyor. Excavation of the area was performed and it was found to be a shallow surface <br />working. The native material below the surface depression was found to be consistent and no <br />signs of a significant working were found. Backfilling of the working will be performed at a later <br />date. The area was bermed off for safety. <br />Underground Working #4014 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The previously logged location was staked by the <br />Ames surveyor. Excavation of the area was performed and it was found to be a shallow surface <br />working. The native material below the surface depression was found to be consistent and no <br />signs of a significant working were found. Backfilling of the working will be performed at a later <br />date. The area was bermed off for safety. <br />Underground Working #4015 was investigated using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The previously logged location was staked by the <br />Ames surveyor. Excavation of the area was performed and it was found to be a shallow surface <br />working. The native material below the surface depression was found to be consistent and no <br />signs of a significant working were found. Backfilling of the working will be performed at a later <br />date. The area was bermed off for safety. <br />D) Structures <br />Relocation of the structure at Underground Working #4008 (Morning Glory) was performed by <br />Frontier Environmental Services Inc. <br />III) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Anchor Trench <br />No work performed during the week. <br />C) Geomembrane Exposure <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />IV) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />MEW Weekly Report WE 01.07.2012 <br />