Laserfiche WebLink
T <br />11M <br />AMEC observed excavation and placement of structural fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed grouting of "miss" (non -void) holes at UG #4000. <br />AMEC observed the cleaning out of UG #4006. <br />AMEC observed grouting of "miss" (non -void) holes at UG #4006. <br />AMEC observed confirmatory drilling at UG #4006. <br />AMEC observed Frontier Environmental Services Inc. relocate the structure at UG #4008. <br />AMEC observed investigation of UG #4014. <br />AMEC observed investigation of UG #4016. <br />AMEC observed investigation of UG #4017. <br />AMEC observed investigation of UG#4018. <br />AMEC observed investigation and remediation of UG #4019. <br />AMEC observed investigation of UG#4020. <br />AMEC observed investigation and remediation of UG #4021. <br />AMEC observed investigation of UG #4022. <br />AMEC observed investigation of UG #4023. <br />AMEC observed investigation of UG #4024. <br />AMEC observed investigation of UG #4025. <br />AMEC observed investigation of UG#4026. <br />AMEC observed investigation of UG #4028. <br />AMEC observed investigation of UG #4029. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process <br />area. This was performed during night shift. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />MEW Weekly Report WE 01.14.2012 <br />