My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-24_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-24_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:51 PM
Creation date
8/28/2012 2:37:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/24/2012
Doc Name
CQA REPORT, JANUARY 2012
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Ames surveyor. Signs of a shaft or stope were encountered in the area during the excavation. <br />Confirmatory drilling will be performed for this working when a drill is available. <br />Underground Working #4028 was "cleaned out" using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The location was staked by the Ames surveyor. <br />Signs of a shaft or stope were encountered in the area during the excavation. Confirmatory drilling <br />will be performed for this working when a drill is available. <br />Underground Working #4029 was "cleaned out" using a CAT 330 excavator and observation was <br />performed by an AMEC field representative. The location was staked by the Ames surveyor. <br />Signs of a shaft or stope were encountered in the area during the excavation. Confirmatory drilling <br />will be performed for this working when a drill is available. <br />D) Structures <br />Relocation of the structure at Underground Working #4008 (Morning Glory) was performed by <br />Frontier Environmental Services Inc. <br />III) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Anchor Trench <br />No work performed during the week. <br />C) Geomembrane Exposure <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />IV) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed clear and grub activities performed by Seedmasters within the Mill Site Earthworks <br />project. <br />AMEC observed stripping of topsoil from within the Mill Site Earthworks project. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to structural fill <br />placement. Subgrade temperatures were monitored prior to any fill placement. <br />MEW Weekly Report WE 01.14.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.