My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-12-13_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2000-12-13_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2021 11:44:07 AM
Creation date
8/28/2012 1:46:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
12/13/2000
Doc Name
Adequacy Issues
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR24
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> Standard Metals <br /> Technical Revision Sunshine #16 <br /> STIPULATIONS <br /> �2-' ,0( <br /> 1 ) The Operator mus submit sample analyses of mine water treatment <br /> C r sludge from Americai Tunnel and the Terry Tunnel . Samples shall be <br /> taken in accordance with EPA protocal and shall be sent to an EPA <br /> certified lab. Res lts shall be submitted to the Division prior to <br /> December 22,1985. <br /> 2) The Operator must submit results of permeability tests of tailings <br /> slimes at the Tailings No.3 Pond. These results must be submitted to <br /> and reviewed by the Division prior to the disposal of mine water `l <br /> N� <br /> treatment sludge at this location. p/( _ (a� rvy ( -A-CA <br /> 3) Construction of the berm along the meander above the sludge, which <br /> was disposed along the banks of the Animas River, must be completed- <br /> prior to December 1 , 1985. <br /> 4) At least two (2 down gradient ground water monitoring wells must be <br /> constructed below the sludge area along the banks of the Animas River <br /> prior to December , 1985. <br /> 5) Construction of the above berm, placement of the tailings slime <br /> liner in pond No. and construction of the ground water monitoring <br /> wells must be inspected and certified by a qualified professional or a <br /> registered professional engineer. Certifications must be submitted to <br /> the Division prior to December 22, 1985. <br /> 6) Ground water sainpling of the above wells shall be on a quarterly <br /> basis for at least one full year to determine possible effects of in <br /> place reclamation of the sludge along the banks of the Animas River. <br /> Parameters shall be mutually agreed upon by the Division and the <br /> Operator. Samples shall be taken in accordance with EPA protocol and <br /> analysed by an EPA certified lab. Results shall be submitted quarterly <br /> to the Division. <br /> Once Stipulations No. 1 through No. 5 have been complied with, the Cease and <br /> Desist Order shall be lifted. <br /> Note: For the Record, this revision calls for submitting of a complete Permit <br /> Amendment on or before April 29, 1986. <br /> 4353 P.C. Saletta <br /> 10/23/85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.