My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-12_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
2001-02-12_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2021 8:41:18 AM
Creation date
8/28/2012 1:46:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
2/12/2001
Doc Name
Submittal
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR25
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR-25 Submittal <br /> Page 5 <br /> BONDING <br /> All installations are to be left as permanent structures upon final reclamation and no <br /> additional land within the MLR Permit area will be disturbed. Therefore, additional <br /> reclamation costs will not be incurred for final reclamation. The existing bond amount <br /> contains$697,000 for replacement of the Terry Tunnel($253,000) and American Tunnel <br /> ($444,000)bulkheads. A secondary near surface bulkhead was placed in the Terry Tunnel <br /> in 2000 and the surface disturbance was reclaimed minimizing any potential for <br /> requirement of future work at this site. Upon completion of the proposed work in TR-25, <br /> there will be in place two additional bulkheads in the American Tunnel precluding any <br /> future need for replacement of the existing American Tunnel bulkhead. Therefore, <br /> additional bonding should not be needed. Sunnyside may request a bond reduction at a <br /> later date to reflect the final closure and reclamation of the Terry Tunnel site and the <br /> American Tunnel portal. <br /> RIGHT TO ENTER <br /> The American Tunnel up to the existing American Tunnel bulkhead(Bulkhead#1) is <br /> owned by Gold King Mines Corporation and SGC has a perpetual easement agreement <br /> for operation of the tunnel. While SGC believes that the easement agreement imparts the <br /> right of closure to SGC, Gold King Mines Corporation supports SGC's proposed <br /> permanent closure of the American Tunnel(letter attached). <br /> SGC believes this project will allow progress towards final reclamation of the Sunnyside <br /> Mine and if TR-25 is approved by DMG, intends to proceed with construction on a <br /> schedule that will allow completion during the 2001 construction season. Therefore, if <br /> additional information or clarifications of submitted information are needed for approval <br /> of TR-25, please contact me. A check for$150 is included with this submittal for the TR <br /> application fee. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Allen Sorenson, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.