Laserfiche WebLink
i <br /> c <br /> TR-25 Submittal <br /> Page 4 <br /> Bulkhead Buffer: Hydrated lime will be placed near the bulkhead faces to provide <br /> additional buffering of the water that will be in contact with the <br /> bulkhead faces. Five tons will be split between the downstream <br /> face of Bulkhead#1 and upstream face of Bulkhead#2 and three <br /> tons will be split between the downstream face of Bulkhead#2 and <br /> up stream face of#3. <br /> DMG will be offered an opportunity for a pre-pour inspection prior to each bulkhead <br /> pour and a construction certification report will be submitted to DMG for each bulkhead. <br /> RECLAMATION PLAN <br /> Changes to the approved reclamation plan for the surface disturbance are not proposed <br /> with this TR. No disturbance of land not previously disturbed within the permit area is <br /> required to implement the proposed work plan. All new construction will be confined to <br /> the underground workings. <br /> After placement of bulkheads, SGC anticipates that reclamation of the portal will be <br /> completed if weather conditions allow. The water treatment system will remain in place <br /> until it is determined that it will serve no further purpose. <br /> MONITORING <br /> SGC does not propose any additional monitoring. The monitoring plan under TR-14 and <br /> site monitoring under SGC's MLR permit are adequate to detect any changes to water <br /> quality as a result of the project. <br />