My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-08-09_INSPECTION - M1977378 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977378
>
1985-08-09_INSPECTION - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 6:12:09 PM
Creation date
8/28/2012 11:47:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
INSPECTION
Doc Date
8/9/1985
Doc Name
Response
From
Standard Metals
To
MLRD
Inspection Date
7/10/1985
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to Site Inspection Report Page 2 <br /> The second phase -of the American Tunnel refuse program should consist of: <br /> A. The institution of a refuse segregation plan that would separate <br /> wood, metal and other materials. <br /> B. The excavation of a suitable pit for the containment, compaction and <br /> burial of wood and paper waste. <br /> C. The stockpiling of all metal materials for sale as scrap, re-use <br /> or burial. <br /> D. All other material should be compacted and contained for shipment to <br /> the mill refuse site. <br /> MAYFLOWER MILL <br /> The Mayflower Mill refuse dump approximately consists of the following <br /> materials: <br /> Spent tires 20% <br /> Wood - timbers, pallets, etc. 15% <br /> Metal - beams, pipe, miscellaneous 10% <br /> Oil drums 8% <br /> Reagent containers 10% <br /> Other - paper, glass, cans, plastic 37% <br /> The first phase of the Mayflower Mill refuse program would consist of: <br /> A. The cleanup and containment of materials that have migrated from the <br /> dump proper. <br /> B. The existing refuse should be compacted and buried to an adequate <br /> depth with barrow material from the adjacent hillside. <br /> C. Surface drainage control by bar ditching should be implemented above <br /> and adjacent to the refuse site. <br /> The second phase of the Mayflower Mill refuse program should consist of: <br /> A. The posting of a "NO PUBLIC DUMPING" sign. <br /> B. The segregation of metal materials vs. all other materials. Note: <br /> metal may be sold and/or used. <br /> C. The construction of wind fencing so as to alleviate the migration of <br /> materials. <br /> D. The excavation of a suitable pit for the containment, compaction and <br /> burial of all materials. <br /> E. The construction of a reagent container decontamination station within <br /> the mill proper. <br /> F. Maintenance of all site components of the Mayflower Mill refuse <br /> program. <br /> TERRY TUNNEL <br /> The Terry Tunnel refuse approximately consists of the following: <br /> Wood - spent timber 60% <br /> Metal - rail, pipe, etc. 40% <br />
The URL can be used to link to this page
Your browser does not support the video tag.