Laserfiche WebLink
The timetable for revegetation of affected lands delineated in the <br /> Reclamation Plan provided for two acres of the total 140 acres dis- <br /> turbed at this site to enter Phase 1 (Seedbed Stabilization) and an- <br /> other two acres to enter Phase 2 during 1977. During the current <br /> year of 1978 the timetable provided for a total of 12 acres to enter <br /> various phases of the revegetation program. At the present time re- <br /> clamation has been initiated on a total of 30 acres since June 1, <br /> 1977; 4.5 acres in 1977; and 25 acres in 1978. <br /> The projected and actual acreages now in various phases of reclamation <br /> are tabulated below, along with the acreage projections for 1979. <br /> Projected Actual <br /> 1977 (Acres) (Acres) <br /> 1. Stabilization 2 - <br /> 2. Pioneer Community 2 4.5 <br /> 3. Successional or Climax - <br /> Community - <br /> TOTAL 4 4.5 <br /> 1978 <br /> 1. Stabilization 5 1.0 <br /> 2. Pioneer Community 5 9.5 <br /> 3. Successional or Climax <br /> Community 2 14.0 <br /> TOTAL 12 24.5 <br /> 1979 <br /> 1. Stabilization 5 <br /> 2. Pioneer Community 8 <br /> 3. Successional or Climax <br /> Community 5 <br /> TOTAL 18 <br /> Correlation of the present status of the above-mentioned affected lands <br /> with that predicted in the Reclamation timetable reveals the program to <br /> be progressing relatively well, and ahead of schedule. <br /> (4) <br /> Grass species to be used in the Reclamation Plan as mentioned in the <br /> permit application were (1) Mountain Mix and (2) Alpine Mix. (see <br /> Appendix A-2 for mix species composition.) These mixes are composed <br /> of grass species both indigenous and introduced to the Silverton area. <br /> The Alpine Mix and Mountain Mix were applied at the application rate <br /> specified on the species composition list during the first year of the <br /> revegetation program (1977) . During the current year (1978) single <br /> -3- <br />