My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-06-23_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1989-06-23_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2021 1:41:12 PM
Creation date
8/28/2012 11:40:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/23/1989
Doc Name
Annual Report
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTURBANCE, AND RFCLAM&TION APRIL I0,88 TO MARCH 1989/ <br /> PLANNED DI8TD8BJ\QCE FOR 1989 <br /> Table A summarizes acreage disturbed and reclaimed by area during <br /> the 1988 reporting year . <br /> TABLE A <br /> Acreage Disturbed and Reclaimed by Site <br /> Acres Acres <br /> Disturbed Disturbed Reclaimed <br /> Site Acres I988 1988 <br /> - A. T. I1 . 5 U 0 <br /> - T. T. 4 , 3 0 0 <br /> - Suouyside Basin 58 . 9 7 . 0 8 <br /> - . . P. No. 4 4�. 2 � . 7 � <br /> - �. P. No. 3 9 . 5 8 G <br /> - T. P. Nos . I 6 2 51 . 7 0 8 <br /> - Eogr ^ Off . 6 <br /> Settling Ponds 15. 7 0 7 (In Progress) <br /> - Mayflower Mill I0 . 2 0 0 <br /> American Tunnel Portal Area - Plate No. l <br /> During the last three quarters of I988 and the first quarter of <br /> 1989 , very little waste rock was transported from the mine and <br /> added to the waste dump. Samples of the waste rock on the dump <br /> were sent out for acid base analysis . The average ADP of the <br /> samples was -I00 based on total aoIfuz (see Appendix ) . Plans are <br /> being prepared to install a perforated pipe at the toe of the <br /> domn for monitoring the effect of' the waste dump on water <br /> quality. <br /> General site clean-op was accomplished during toe oonomec rouths . <br /> Metal material was separated and hauled away by a zecyclec / and <br /> other material (mostly timber) was naole8 to Tailings Pond No. l <br /> for eventual burial . <br /> A piping cnanqe at the water treatment plant now allows foII <br /> treatment of the water flow from the mine. This change consisted <br /> of installing a 16/' pipeline from the water treatment mix tank to <br /> the twin 10-iocn bypass lineo . The quality of the discharge <br /> water was dramatically improved with this change . <br /> The settling ponds were cleaned almost continuously from late <br /> June 1988 through March 1989 except for when the Terry Tunnel <br /> ponds were pumped and for periods of bad weather or mechanical <br /> breakdowns during the winter . The increase in cleaning was <br /> required to thoroughly clean the ponds to increase retention <br /> - 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.