My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-05-31_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1988-05-31_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 6:27:01 AM
Creation date
8/28/2012 11:27:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
5/31/1988
Doc Name
Annual Report- April 1987 to March 1988
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tailings Pond No. 1 will be sprayed with a dust suppressant during <br /> 1988 . <br /> Engineering Office_Settling Ponds Area <br /> San Juan County will remove the Old Engineering Building in June <br /> 1988 (Plate 3 ) . Earthwork for reclamation of the settling ponds area <br /> will begin in July 1988 with a planned fall seeding. <br /> Mayflower Mill Area <br /> Scrap iron consisting of old barrels , spent machine parts , and <br /> structural steel was sold to a recycler and removed from the site <br /> (Flate 3 ) . A new drainage ditch and drop box were constructed for <br /> collecting and transporting floor drainage to the "duck" pond, <br /> located near the guard shack. A Flyght submersible pump was <br /> installed in the pond to maintain the standing water level at a <br /> minimum. Accumulated sediments in the pond were excavated and <br /> returned to the mill several times during the year. <br /> A new reagent storage building was completed to the north of the <br /> mill , providing covered storage for reagents during the summer <br /> months . During winter, only lime is stored in the building due to <br /> avalanche danger. <br /> A new 2000 gallon above ground diesel fuel tank was installed to <br /> the south of the mill , replacing the smaller tank near the old tram <br /> terminal . No additional disturbance or reclamation is planned for <br /> the Mayflower Mill area in 1988 . <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.