My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-05-31_REPORT - M1977378
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1988-05-31_REPORT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2021 6:27:01 AM
Creation date
8/28/2012 11:27:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Report
Doc Date
5/31/1988
Doc Name
Annual Report- April 1987 to March 1988
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
trials are attempted on salvaged topsoil stripped from the open pit <br /> aromas during the summer of 1988 . <br /> As described in Amendment No. 3 , two open pits in the Sunnyside <br /> Darin will be started in 1988 . The Lake Emma glor;: hole will remain <br /> ur__eclaimed, and it will be used as an ore pass tc the mine for <br /> ha--lage to the Mayflower Mill . Upon completion o-f the open pit <br /> project, the waste rock generated by the open pits will be used to <br /> ba=kfill the open stopes . <br /> Ta_ linas Pond No. 4 Area <br /> Normal maintenance was conducted on the Tailin=s Fond No. 4 <br /> fa=•ilities ( Plate 3 ) . Drainage ditches above the .ailings ponds were <br /> pr--L.ned of young aspen trees and other accumulated -vegetation, and <br /> wa-er collecting in the pump back pond was periodically pumped to the <br /> reservoir. A dust suppressant was sprayed on the pond outslope twice <br /> du=-ing the summer of 1987 . Repeat spraying is required by the <br /> current modified centerline raise method which adds new sands to the <br /> po_d outslope each successive pour. <br /> The embankment elevation had reached 9413 feet as of July 9, 1987 <br /> any several alternatives are being considered in order to extend the <br /> li_e of the impoundment. Test drilling of the slimes and sands was <br /> cc-ducted during October 1987 to investigate the feasibility of <br /> raising the berm by the upstream method. If this alternative proves <br /> ec=nomically and technically sound, a permit technical revision will <br /> be submitted to the Division detailing the required land disturbance <br /> an� modifications to the reclamation plan which will be entailed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.