My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089 (87)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2012-06-20_PERMIT FILE - C2010089 (87)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/27/2012 10:06:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Draft EPA Report 1977a of Negative AVF
Section_Exhibit Name
Appendix 2.06.8-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Operations Ce4logic and Structure Nap" (TC.). Provide a base and contour <br />map of water tables nr pfrxometric surfaces of water In each significant <br />aquifer to he disturbed by mining (Including any aquifer lying less than <br />70 in below th deepest coal ,scam to he mined) and the. highest undisturbed <br />aquifer in thrj area of operations; perched water table conditions where <br />observed, will, be indicated. Contour intervals will not exceed 2 m ex- <br />..ept in special instances of steep ground water gradients, and should be <br />presented with an accuracy of 15 percent. Flow lines shall be in indi- <br />cated. (Preparation of this map will require the drilling of observa- <br />tion wells, or piezometer nests cased to ensure reception o water frog <br />only one aquifer during testing and sampling. Ceologi should be <br />obtained when the wells are drilled: see "Ceo10 Leila t a n ".) <br />INC. Detailed Information describing the charact >s\of s" flow aqui- <br />fers shall be obtained from aquifer pumpin_ e e s d i. at least <br />two separate locations in each aquifer local area of opera- <br />tions. Data submitted will include field me s of permeability, <br />transmissivity and the storage coefficients. ore samples will be used <br />to obtain laboratory estimates of pre- and post - mining permeabilities. <br />• Construction details of all wells used in preparing the information will <br />be supplied. Pumping tests conducted in the areas designated by the re- <br />gulatory authority as alluvial valley floor areas shall be designed to <br />identify leakage between alluvial aquifers and deeper aquifers to be dis- <br />turbed by mining (as well as leakage between multiple aquifers that may <br />be disturbed). Locations of recharge to any alluvial valley floors will <br />be identified and their role in the recharge cycle will be identified. <br />All information will be reviewed and approved (as to its accuracy and <br />interpretation) by a second independent and qualified party. <br />IIID. Water Quality Analyses of ground water samples collected (at least twice <br />and not closer together in time than four months), from all wells used in <br />preparing the "Detailed Hydrologic Map of the Area of Operations" shall be <br />submitted. Timing of sample collection will, at a minimum, coincide with <br />seasonal highs and lows in water table or piezometric surfaces. Samples <br />shall represent as closely as possible aquifer water and shall.not be con- <br />taminated by the well casing, cement, or drilling fluids. Analyses may be <br />reduced if sufficient information is submitted to the regulatory authority <br />to permit affirmation of consistency of water quality. Water Quality <br />Analyses will include: <br />PH <br />Parameter <br />specific conductance <br />(mmho /cm at 25 C) <br />turbidity (Jackson units) <br />total alkalinity as CaCO <br />(mg /1) <br />total acidity (mg /I) <br />oil and grease (mg /1) <br />carbonate (mg /1)(meq /1) <br />bicarbonate (mbl)meq /1) <br />Field meter <br />Wheatatone bridge <br />Turbidimeter <br />Procedure <br />Titration; electrometric; manual or <br />automated method -- methyl orange <br />Electrometric end point or <br />phenolphthalein end point <br />Liquid - Liquid extraction with <br />trichlorotrifluoroethane <br />Titration, electrometric; manual or <br />automated method---methyl orange <br />Titration; electromatic; manual or <br />automated method — methyl orange <br />
The URL can be used to link to this page
Your browser does not support the video tag.