Laserfiche WebLink
Activity <br />Year <br />Contemporaneous Reclamation of Mined Area <br />Backfill Replacement <br />Topsoil Replacement <br />Revegetation <br />2013 -2018 <br />2013 -2018 <br />2014 -2018 <br />Relocation of CC Ditch <br />2016 <br />Facilities <br />2019 <br />Haul Roads <br />2020 <br />Phase 1 Bond Release <br />2016 -2018 <br />Phase 2 Bond Release <br />2021 -2023 <br />Phase 3 Bond Release <br />2028 <br />Sediment Ponds <br />2029 <br />i <br />Table 2.05.4(2)(a) -1 <br />Reclamation Time Table <br />Section 2.05.4 Page 3 April 2011 <br />