My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/24/2012 10:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an outline of the general design procedures used in the design of culverts: <br />1. Identify the need for a structure from topographic maps, and a visit to the site; <br />2. Determine the size and hydrology of the watershed in question; <br />3. Perform SEDCAD, or other acceptable software, computer run to determine the <br />peak runoff from a 10 -year, 24 -hour precipitation event. <br />4. Using SEDCAD, or other acceptable software, computer run to determine the <br />proper size of culvert to handle the peak runoff from a 10 -year, 24 hour <br />precipitation event. SEDCAD design runs can be found in Appendix 2.05.3(3) -1 <br />Other applicable methods of culvert design include the use of charts developed by the Federal <br />Highway Administration, published in Hydrologic Engineering Circular HEC -5 (FHA, 1980), <br />and Hydrologic Design Series HDS -3 (FHA, 1980). <br />Charts published in HEC -10 (FHA, 1978) are also used; however, exit velocities must then be <br />determined by other methods. Headwater conditions are typically examined by using HEC -5 <br />inlet control nomograph. To be conservative and to allow for adequate freeboard, WFC usually <br />uses "projecting" conditions. <br />As virtually all culverts have free outfalls, inlet control assumptions can be verified by the "Pipe <br />Flow Charts" in HDS -3. If flow in the culvert has a free surface, entrance control exists, and exit <br />velocity can be approximated by using the greater of normal or critical velocity determined by <br />the "Pipe Flow Charts" in HDS -3. <br />Maintenance. Haul roads will be inspected on a daily work basis at the NHN Mine. If, upon <br />inspection, it is determined that repairs are needed, appropriate repairs such as, but not limited to, <br />grading, filling of potholes, replacement of the road surfaces, revegetation of side slopes and <br />watering for dust control, will be conducted as necessary. Magnesium Chloride solution may be <br />Section 2.05.3(3) Page 9 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.