My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/24/2012 10:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drainage. As most road cuts are into resistant bedrock -type material, ditches normally do not <br />require lining. Culverts will be designed and installed to minimize the runoff volume conveyed <br />in each ditch. Culverts and ditches will typically be designed using SEDCAD or other generally <br />accepted software to predict the peak runoff and Manning's equation to determine the peak <br />velocity and flow depth. <br />If the ditch is not stable, then WFC will use a larger ditch section and/or adequately line the ditch <br />in order to comply with applicable regulations. <br />Drainage from haul roads within the areas disturbed by mining and reclamation activities (see <br />Map 2.05.3(3) -3) will be constructed to meet the requirements of 4.05.2 and such haul roads will <br />at a minimum be constructed and maintained to minimize erosion of the disturbed area. Erosion <br />control measures to be used singly or in combination include but are not limited to: <br />a. Stabilizing all exposed surface areas to promote a reduction in the rate and <br />volume of runoff; <br />b. Using straw dikes, riprap, check dams, berms, geotextile materials, mulches, <br />vegetation sediment filters, contour furrows or other measures that reduce <br />overland flow velocity, reduce runoff volume, or trap sediment; or <br />c. Such other measures to minimize erosion resultant siltation and disturbance to the <br />prevailing hydrological balance. <br />Culverts will be installed to avoid plugging or collapse and to avoid erosion at the inlets and <br />outlets. Riprap will be installed as necessary to reduce the exit velocity. The minimum width <br />will be the width of the natural downstream channel. The riprap will be sized in the field based <br />on the "as- built" slope of the culvert and final configuration of the exit channel slope area. The <br />sizing shall be based on the Federal Highway Administration's HEC No. 11 "Use of Riprap for <br />Bank Protection" or other standard methods. All pipes will have a minimum cover of 12 inches. <br />Culverts and drainage ditches will be maintained periodically to prevent accumulation of debris <br />on the culverts inlets and outlets. <br />Section 2.05.3(3) Page 8 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.