Laserfiche WebLink
Ponds, other treatment facilities and diversions are discussed in Section 2.05.3(4) . Utility <br />relocations are discussed in Section 2.05.03(3). <br />2.05.3(3) Mine Facilities <br />Please see a separate section devoted for 2.05.3(3) Mine Facilities <br />2.05.3(4) Ponds, Impoundments, Other Treatment Facilities and Diversions <br />Please see a separate section devoted for 2.05.3(4) Ponds, Impoundments, Other Treatment <br />Facilities and Diversions <br />2.05.3(5) Topsoil <br />Please see Section 2.05.4(2)(d) Topsoil Redistribution for a discussion on Topsoil as required by <br />2.05.3(5). <br />2.05.3(6) Overburden <br />Please see Section 2.05.4(2)(c) Backfilling and Grading for a discussion on overburden as <br />required by 2.05.3(6). <br />2.05.3(7) Coal Handling Structures <br />No coal crushing or processing will occur at the mine. The run -of -mine coal will be loaded on <br />highway trucks in the pit and hauled to the Nucla Station for further processing. <br />Section 2.05.3 Page 5 November 2011 <br />