My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_PERMIT FILE - C2010089A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089A
>
2012-06-20_PERMIT FILE - C2010089A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:22 PM
Creation date
8/24/2012 9:59:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
6/20/2012
Doc Name
Operation Plan
Section_Exhibit Name
Section 2.05.3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parting for the overburden removal fleet. The stockpile will always be located in an area with <br />controlled drainage to a permitted discharge outfall. Stockpile parameters will rarely exceed <br />10,000 tons or thirty days in duration and the location will change depending on the rate of pit <br />migration. <br />The estimated coal tonnage, overburden and parting volumes to be extracted for all mining areas <br />are presented on Table 2.05.3 -2. <br />The coal quantities required from the NHN Mine under Western Fuels- Colorado's contract to <br />supply Tri -State Generating and Transmission Associations' Nucla Station are estimated to be <br />from 320,000 to 460,000 tons per year. Whenever possible, overburden stripping and coal <br />loading will be sequenced to maintain an in -pit inventory of approximately one month's coal <br />requirements. Additionally, overburden stripping and coal loading will be sequenced to allow <br />blending of coal in the pit to enable delivery of relatively uniform quality coal to the power plant. <br />The CC Ditch Company's Second Park Lateral Ditch is scheduled to be temporarily diverted into <br />a large HPDE pipeline to facilitate mining that area of the permit where the current ditch crosses. <br />Del -Mont Consultants of Montrose is preparing the design for this pipeline diversion. Design <br />details are located in Appendix 2.05.3(3) -4. The Timing of Operations table, Table 2.05.3 -3, at <br />the end of this section describes the sequence in more detail. The approved Montrose County <br />Special Use Permit is shown in Appendix 2.05.3 -1. <br />The pipeline is of thick high density polypropylene (HDPE) and was designed to handle the full <br />ditch flow currently carried in the ditch. WFC is working with the CCC Ditch Company and Del - <br />Mont Consultants to ensure that the design will satisfy CCC Ditch Company needs and that the <br />Company will be provided a long term supply of water that is equal or better than their current <br />supply. The plan also ensures that no downstream user will be interrupted at any time, since the <br />work will be conducted in between irrigation seasons. <br />Section 2.05.3 Page 4 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.