parting for the overburden removal fleet. The stockpile will always be located in an area with <br />controlled drainage to a permitted discharge outfall. Stockpile parameters will rarely exceed <br />10,000 tons or thirty days in duration and the location will change depending on the rate of pit <br />migration. <br />The estimated coal tonnage, overburden and parting volumes to be extracted for all mining areas <br />are presented on Table 2.05.3 -2. <br />The coal quantities required from the NHN Mine under Western Fuels- Colorado's contract to <br />supply Tri -State Generating and Transmission Associations' Nucla Station are estimated to be <br />from 320,000 to 460,000 tons per year. Whenever possible, overburden stripping and coal <br />loading will be sequenced to maintain an in -pit inventory of approximately one month's coal <br />requirements. Additionally, overburden stripping and coal loading will be sequenced to allow <br />blending of coal in the pit to enable delivery of relatively uniform quality coal to the power plant. <br />The CC Ditch Company's Second Park Lateral Ditch is scheduled to be temporarily diverted into <br />a large HPDE pipeline to facilitate mining that area of the permit where the current ditch crosses. <br />Del -Mont Consultants of Montrose is preparing the design for this pipeline diversion. Design <br />details are located in Appendix 2.05.3(3) -4. The Timing of Operations table, Table 2.05.3 -3, at <br />the end of this section describes the sequence in more detail. The approved Montrose County <br />Special Use Permit is shown in Appendix 2.05.3 -1. <br />The pipeline is of thick high density polypropylene (HDPE) and was designed to handle the full <br />ditch flow currently carried in the ditch. WFC is working with the CCC Ditch Company and Del - <br />Mont Consultants to ensure that the design will satisfy CCC Ditch Company needs and that the <br />Company will be provided a long term supply of water that is equal or better than their current <br />supply. The plan also ensures that no downstream user will be interrupted at any time, since the <br />work will be conducted in between irrigation seasons. <br />Section 2.05.3 Page 4 November 2011 <br />