Laserfiche WebLink
t <br /> Cement Creek Diversion <br /> Page 2 <br /> o Topsoil is sparse to nonexistent over much of the area to be <br /> disturbed. The estimated quantity of salvageable topsoil will <br /> be in a range of 30-150 cubic yards. If significantly more <br /> topsoil is encountered a designated area will be set up. <br /> Otherwise the topsoil will be stored conveniently for <br /> replacement along the bench. <br /> Please contact me if this letter does not adequately address the <br /> items in your May 22, 1996 letter. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br />