File No. M- 77-378 <br /> Page 2 <br /> Mill area have been identified where this is occurring. Their locations are marked on the attached <br /> maps as Intercept Points A, B, and C. <br /> Outside the MLR permit area (under the voluntary Consent Decree agreement with CDPBE and <br /> permitted by the facility Stormwater Permit), interception structures will be constructed to <br /> capture and transport flowing surface water past the areas where it is currently going subsurface. <br /> The interception structures will not impede flow-thru from any storm events that may occur that <br /> are too large for the inlets to the system. These flow-through events, if they were to occur, would <br /> be controlled by the existing upland diversion system within the permit area. <br /> The transport pipes will be 24" ADS N-12 smooth interior pipe with leak-proof couplings. The <br /> 24" diameter was selected to facilitate and minimize maintenance. A 12" diameter pipe would be <br /> more than adequate to carry the anticipated and observed flows. Outfalls from the ADS pipe will <br /> be rock armored to prevent erosion. <br /> The transport pipes will enter the MLR Permit area as buried pipes. In drainages A and B, the <br /> pipes will if possible extend under the existing upland diversion ditch to discharge into the <br /> drainage path that drains runoff from the top of Tailings Pond No. 1 located at the back of the <br /> pond. This drainage is currently not large enough to carry the additional runoff water. It will be <br /> enlarged and lined with 40 mil PVC liner. The liner will be covered with rocky subsoil material. <br /> Where ditch slopes increase, the cover material will be armored with cobble/rock material to <br /> prevent erosion. If it is not possible tho carry the pipe under the existing diversion ditch, the pipe <br /> will outfall into the existing drainage ditch. <br /> The existing diversion ditch has the capacity to transport over 5 times the flow calculated from a <br /> 100 year, 1-hour storm of 2.3 inches (ie. capacity- 300 cfs, calculated flow- 55 cfs <br /> Consolidated Permit, 1987). If the outfall is into the existing diversion ditch, no changes are <br /> required since it is sized to carry the design storm from these drainages. <br /> The proposed lined ditch at the back of Tailings Pond No. 1 (to be constructed if the pipe outfall <br /> can be extended to pass under the existing drainage ditch)will have the capacity to carry greater <br /> than 50 cfs. The maximum flow anticipated would be runoff from the top of Pond No.1 (100 <br /> year, 1-hour storm of 2.3 inches) at 5.5 cfs and the capacity of the 2 - 24" pipes to be placed in <br /> drainages A and B (inlet conditions will limit the flow to less than 10 cfs for drainage A and 2 cfs <br /> for drainage B). Required capacity of the ditch to carry design flows would be 17.5 cfs which is <br /> less than the minimum flow capacity of 50 cfs for the proposed ditch. Observed flows have been <br /> less than 1 cfs. Any flows in excess of the inlet capacity will go into the existing diversion system. <br /> The drainage pipe installation is oversized to provide for ease of maintenance although the system <br /> is being constructed to minimize the potential for maintenance requirements. <br /> In drainage C, the transport pipe will also be a buried 24" ADS N-12 pipe where it enters the <br /> permit area. This line is also oversized and inlet conditions will limit flows to less than 10 cfs. <br />