My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-04-05_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1993-04-05_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 5:35:40 PM
Creation date
8/23/2012 10:48:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
4/5/1993
Doc Name
TR Request
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR15
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunnyside Basin M-77-378 <br /> Page 3 <br /> General Specifications - Cont <br /> Cross-Section- The side slopes will be 2: 1 where excavated in <br /> overburden with transitions (steeper or flatter) to <br /> natural rock contour where exposed or approximately <br /> 3/4 : 1 where blasted. <br /> The finished ditch bottom will be approximately 5 <br /> feet wide. It will be overexcavated initially and <br /> the downhill sideslope will be rebuilt with lake <br /> sediments (ie. clay material ) to maximize <br /> groundwater flow interception. The depth will vary <br /> with surface and bedrock topography. <br /> Excavated Material - Overburden material excavated will be; <br /> 1) blended into the surrounding disturbed hillside. <br /> 2) used to reduce a portion of the nighwall in the <br /> Sunnyside pit. <br /> 3) used to backfill ditch excavations where <br /> groundwater interception does not warrant ditch <br /> or drainpipe installation. <br /> 4) used to backf i ll ditch excavations where the <br /> drainpipe installation is selected because of <br /> depth or surface runoff interception potential . <br /> Drainpipe - See Figure 2 for typical section <br /> Slope - The profile will be the same as for open ditch <br /> construction. <br /> Pipe - The pipe size will vary with the intercepted flow. <br /> It is anticipated that it will vary from 8 " to 12" . <br /> The pipe will be either HDPE or concrete with a <br /> clean aggregate cover. The aggregate will be <br /> covered with filter cloth to prevent fine material <br /> from infiltrating. The HDPE will have slot <br /> perforations and the concrete pipe will be laid <br /> with 1" - 1 1/2" spacing every joint (approximately <br /> 5 ' ) . Perforations/joint spaces will be wrapped <br /> with filter cloth to prevent aggregate <br /> infiltration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.