Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # OIA Page 2 of 3 <br />046 <br />047 <br />048 <br />049 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />100 <br />101 <br />102 <br />Regrade West Pyeatt Access Road (1 and 2) <br />DOZER <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7.14 <br />Regrade Middle Pyeatt Access Road (1, 2 and 3) <br />DOZER <br />6.61 <br />Regrade East Pyeatt Access Road (1, 2 and 3) <br />DOZER <br />8.75 <br />Regrade Grouse Access Road <br />DOZER <br />4.57 <br />Regrade West Flume Access Road <br />DOZER <br />2.68 <br />Regrade East Flume Access Road <br />DOZER <br />2.68 <br />Regrade Deal Access Road <br />DOZER <br />11.25 <br />Regrade Horse Access Roads (Horse and Horse I) <br />DOZER <br />8.75 <br />Regrade West Horse Access Road <br />DOZER <br />12.86 <br />Regrade Middle Flume Access Roads (1, 2 and 3) <br />DOZER <br />6.89 <br />Regrade Oak Access Roads <br />DOZER <br />3.39 <br />Re grad Sage Access Roads <br />DOZER <br />4.46 <br />Regrade Johnson Access Road <br />DOZER <br />11.07 <br />Regrade Elk 1 Access Road <br />DOZER <br />2.68 <br />Regrade East Buzzard Access Road <br />DOZER <br />2.68 <br />Regrade Far East Buzzard Access Road <br />DOZER <br />2.68 <br />Regrade K -Pit Haul Roads JR -106) <br />DOZER <br />54.11 <br />Rip BC Walk Road <br />RIPPER <br />2.24 <br />Rip D Pit Haul Roads (D1, D3, D4, D5 and <br />Dmain) <br />RIPPER <br />8.40 <br />Rip West Ash Haulroads (West Ash, West Ashl <br />and West Ash 2) <br />RIPPER <br />5.98 <br />Rip LOM Haul Roads (172 and F2 -G5) <br />RIPPER <br />8.76 <br />Rip A Pit Haul Roads (Middle A and North A) <br />RIPPER <br />6.43 <br />Rip F Pit Haul Roads (FMain, F0, F1, F3, F4 and <br />FO 1) <br />RIPPER <br />5.38 <br />Rip Middle Z and F2 Haul Roads <br />RIPPER <br />2.24 <br />Rip East Middle Z and Z3 Haul Roads <br />RIPPER <br />2.30 <br />Rip EF Haul Roads <br />RIPPER <br />0.53 <br />Rip East A Haul Roads (East A and East A Split) <br />RIPPER <br />2.96 <br />Rip G5 Haul Roads <br />RIPPER <br />0.89 <br />Rip Access Road (Tasks 042 -061) <br />RIPPER <br />3.11 <br />Rip K Pit Haul Roads (KMain, K1, K2, K3) <br />RIPPER <br />2.12 <br />Rip K Pit Haul Roads (TR106) <br />RIPPER <br />3.37 <br />Regrade Coyote Impoundment <br />DOZER <br />288.69 <br />Regrade Middle Pyeatt Impoundments <br />Impoundment (1,2, 3) <br />DOZER <br />51.73 <br />Regrade Far East Buzzard Impoundment <br />DOZER <br />0.56 <br />Regrade Sage Impoundments (1 and 2) <br />DOZER <br />18.91 <br />Regrade West Horse Impoundment <br />DOZER <br />3.52 <br />Regrade Impoundment H <br />DOZER <br />7.29 <br />Regrade Industrial Waste Pond <br />DOZER <br />7.47 <br />Replace Topsoil on Ash Dump Pits <br />SCRAPERI <br />210.51 <br />Replace Topsoil on D/E Pits <br />SCRAPERI <br />246.54 <br />Replace Topsoil on Z Pits <br />SCRAPERI <br />81.63 <br />Replace Topsoil on F Pit Area <br />SCRAPERI <br />45.38 <br />Replace Topsoil on G Pit Area Including K -Pit <br />SCRAPERI <br />604.73 <br />Replace Topsoil on East A Pit Area <br />SCRAPERI <br />110.26 <br />Replace Topsoil at West Panel Ponds, BC Road <br />and Shop <br />SCRAPERI <br />159.71 <br />Replace Topsoil at East Panel Ponds and A Road <br />SCRAPERI <br />282.90 <br />Seed D Pit Range A -B <br />REVEGE <br />204.60 <br />Seed F Pit Range A -B <br />REVEGE <br />445.90 <br />Seed Z Pit Range A -B <br />REVEGE <br />190.20 <br />$9,214.99 <br />$8,523.73 <br />$11,288.79 <br />$5,897.71 <br />$3,455.76 <br />$3,455.76 <br />$14,513.75 <br />$11,288.79 <br />$16,587.55 <br />$8,893.00 <br />$4,377.26 <br />$5,759.23 <br />$14,283.52 <br />$3,455.76 <br />$3,455.76 <br />$3,455.76 <br />$69,802.01 <br />$3,056.00 <br />$11,450.00 <br />$8,149.00 <br />$11,939.00 <br />$8,760.00 <br />$7,334.00 <br />$3,056.00 <br />$3,137.00 <br />$733.00 <br />$4,034.00 <br />$1,222.00 <br />$4,238.00 <br />$2,893.00 <br />$4,592.00 <br />$186,196.24 <br />$16,680.94 <br />$181.71 <br />$6,098.90 <br />$1,133.91 <br />$2,349.35 <br />$2,408.85 <br />$794,595.85 <br />$930,593.61 <br />$308,106.34 <br />$171,304.97 <br />$2,282,655.59 <br />$416,193.71 <br />$602,859.79 <br />$1,067,850.97 <br />$122,349.32 <br />$266,644.97 <br />$113,738.22 <br />CIRCES Cost Estimating Software <br />