Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # OIA Page 3 of 3 <br />103 <br />104 <br />105 <br />106 <br />107 <br />108 <br />109 <br />120 <br />121 <br />122 <br />123 <br />124 <br />130 <br />131 <br />132 <br />Seed G Pit Range A -B <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />600.59 <br />$359,148.47 <br />$133,890.58 <br />$49,693.20 <br />$32,052.41 <br />$47,128.14 <br />$5,689.06 <br />$6,735.84 <br />$13,715.19 <br />$64,438.07 <br />$98,105.14 <br />$8,775.74 <br />$36,811.96 <br />$1,142,491.73 <br />$67,488.87 <br />$35,704.11 <br />Seed Ash Dump Range A -B <br />REVEGE <br />223.90 <br />Seed East A Pit Range A -B <br />REVEGE <br />83.10 <br />Seed A Pit Range C -B <br />REVEGE <br />53.60 <br />Seed H Pit <br />REVEGE <br />207.10 <br />Seed Ash Dump Range B <br />REVEGE <br />25.00 <br />Seed D/E Pit Range B <br />REVEGE <br />29.60 <br />Seal 16 Boreholes (MR212) <br />BOREHOLE <br />24.00 <br />Seal 75 Developmental Drill Holes <br />BOREHOLE <br />111.00 <br />Seal Monitoring Wells <br />BOREHOLE <br />74.00 <br />Sealing Stations 1 -4 <br />BOREHOLE <br />6.24 <br />Seal 4 Monitoring Wells (MR217) <br />BOREHOLE <br />6.24 <br />Demolish structures, remove materials and debris <br />DEMOLISH <br />100.00 <br />Culvert Removal and Disposal <br />DEMOLISH <br />60.00 <br />Mobilize and Demobilize from Hayden, CO <br />MOBILIZE <br />4.22 <br />SUBTOTALS: <br />12594.6 <br />$ $24,711,445.76 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$499,171.20 <br />Performance bond: <br />1.05 <br />Total = <br />$259,470.18 <br />Job superintendent: <br />6,297.30 <br />Total = <br />$373,429.89 <br />Profit: <br />10.00 <br />Total = <br />$2,471,144.58 <br />TOTAL O & P = <br />$3,603,215.85 <br />CONTRACT AMOUNT (direct + O & P) = <br />$28,314,661.61 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />3.27 <br />Total = $925,889.43 <br />Reclamation management and /or administration: <br />2.65 <br />$750,338.53 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $5,279,443.82 <br />TOTAL BOND AMOUNT (direct + indirect) = $29,990,889.58 <br />C[RCES Cost Estimating Software <br />