Mr. Peter Hays <br />RE: City of Greeley M- 2002 -020 <br />August 10, 2012 <br />17. The SE Pond will be dewatered to allow for construction of two berms that will separate <br />the pond area designated for backfilling. This process is shown on the revised <br />Exhibit C -5 attached. The dewatering will only occur to dry the pond bottom sufficiently <br />for equipment access (assumed to be approximately 20 feet). The berms will be created <br />by placing fill material excavated from the mining cell. On the water side of the berm, <br />3H:1V slopes will be created. Following creation of the berms, dewatering will cease <br />and backfilling will begin. When sufficient backfill material is temporarily stockpiled on <br />the north bank of the pond, the material will be pushed into the pond (north and west of <br />the berms) using dozers or other appropriate equipment. The backfilling will continue <br />until the backfill material reaches the berms and open water is minimized or eliminated. <br />6.4.5 Exhibit E — Reclamation Plan <br />18. It is anticipated that the site will be released from the MLRB permit prior to significant <br />trail or other public facility creation. However, if the site is still covered by the permit at <br />the time of these improvements, a technical revision will be submitted prior to the <br />changes being made. <br />19. It is anticipated that the site will be released from the MLRB permit prior to installation <br />of the inlet and outlet works. However, if the site is still covered by the permit at the <br />time of these improvements, a technical revision will be submitted prior to the changes <br />being made. <br />20. The site will be included in the City of Greeley Noxious Weed Program. <br />21. During reclamation, freshly seeded areas will be covered with 4,000 pounds of certified <br />weed -less mulch per acre. <br />22. The backfilling process for the NE and SE ponds is described in #17 above. Structures or <br />other facilities are not proposed for the backfilled areas, therefore, no compaction <br />specifications are proposed. <br />6.4.7 Exhibit G — Water Information <br />23. The last two sentences of the first paragraph of Exhibit G, Water Information, should <br />read: <br />"The proposed amendment area includes 197.51 acres. Including the <br />89.16 acres in the existing 25 Avenue Site, the total proposed permit area <br />is 286.67 acres." <br />24. Quarterly depth to groundwater data collected from wells identified on revised <br />Exhibit C -5 will be submitted as part of the Division annual reports. <br />Page 3 of 5 <br />