My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-17_INSPECTION - C1981028
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981028
>
2012-08-17_INSPECTION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:24 PM
Creation date
8/17/2012 10:07:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Date
8/17/2012
Doc Name
Inspection Report
From
DRMS
To
Donald MacDonald
Inspection Date
8/16/2012
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 16, 2012 C- 1981 - 028 /Keenesburg Strip Mine BFB <br />Inspection Topic Summary <br />NOTE: Y= Inspected N =Not Inspected R= Comments Noted V= Violation Issued NA Applicable <br />R - Air Resource Protection <br />R - Roads <br />N - Availability of Records <br />R - Reclamation Success <br />R - Backfill & Grading <br />R - Revegetation <br />N - Excess Spoil and Dev. Waste <br />N - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />N - Fish & Wildlife <br />N - Support Facilities On -site <br />R - Hydrologic Balance <br />N - Signs and Markers <br />N - Gen. Compliance With Mine Plan <br />N - Support Facilities Not On -site <br />R - Other <br />N - Special Categories Of Mining <br />N - Processing Waste <br />N - Topsoil <br />COMMENTS <br />INTRODUCTION: - This was a partial inspection of the Keenesburg Strip Mine conducted by Brock Bowles of <br />the Colorado Division of Reclamation, Mining and Safety on August 16, 2012. Mr. Donald MacDonald and <br />Danny Kipp of Coors Energy Company were present for the inspection. The weather conditions were sunny, <br />warin, and dry. There was a light breeze. <br />AIR RESOURCE PROTECTION — Rule 4.17: <br />Compost was being spread by a manure spreader and a front end leader was leading the spreader during <br />the inspection (photo 1). Three piles of coal ash were in the pit ready for spreading. No fugitive dust was noted <br />onsite or off. <br />BACKFILL and GRADING — Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination <br />4.14.1(2)(f); Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.143; Stabilization of Rills and <br />Gullies 4.14.6: <br />Coal ash was piled in the B -Pit ready for spreading and cover fill (photo 2). The direction B -Pit is being <br />back -filled has changed. It was being back -filled from the southern end to the north. It is now being filled from <br />the western side of the pit to the eastern side. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4, Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Sediment pond 2 was dry, the vegetation in the bottom was recently mowed and the sediment/water gauge <br />was in place (photo 3). The water outlet structure was free and clear of obstructions. <br />There was no standing water in B -Pit. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.