Laserfiche WebLink
INSPECTION REPORT - PAGE 3 <br /> FILE NO. M-77-378 <br /> DATE: February 11 and 12, 1986 <br /> 4. On February 12, 1986, Douglas Murray accompanied the Division <br /> representatives on an inspection of the American Tunnel and Tailing Ponds 1 <br /> through 4 sites. <br /> 5. Refuse disposal at the American Tunnel site, in particular, wood products <br /> placement and incineration atop the old tailings pond, was discussed. This <br /> would increase the amount of organic matter in the current tailings pile, <br /> promoting a plant growth medium, thereby facilitating future revegetation <br /> efforts. <br /> A thin veneer of wood products atop the current trash pile over which plant <br /> growth medium will be replaced was also discussed. <br /> /tmb <br /> cc: Mr. Gregory B. Sparks <br /> Mr. Mike Stanton, Quaternary Environmental Consulting <br /> 7677F <br />