My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-13_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2012-08-13_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:09 PM
Creation date
8/13/2012 2:36:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
8/13/2012
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
New Elk Coal Company
Type & Sequence
TR66
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br />NECC: Please see revised page 2.05 -7a. The haul road width will vary from 24-30'. The section <br />shown on Map -11 Sheet -1 has been revised to show the revised width from 24-30'. <br />Division: Response is sufficient. <br />4. The final two paragraphs on Page 2.05 -10 discussing the SAE south of Pond 7 and the cut slopes <br />above the upper divisions ditch at the Bates Portal have been removed. Please provide an explanation <br />on xvhv these discussions were removed from Page 2.05 -10 or submit a revised page including these <br />paragraphs. <br />NECC: Please see revised page 2.05 -10 including the final two paragraphs. <br />Division: Response is sufficient. <br />5. There appears to be an an error on Map 13 — East Portal Sediment and Surface Water <br />Control Plan. There is an additional culvert "C -A" near the bottom of the haul road to the <br />RDA. Please submit a revised Map 13 correcting this error. <br />NECC: Please see revised Map -13. <br />Division: Response is sufficient. <br />6. In the SEDCAD model, flow into Culvert 81 should be for the 100 -year runoff rather <br />than the 10 -year runoff Please submit an updated SEDCAD model including a 100 -year <br />runoff to ensure Culvert 81 can sufficiently handle a 100 -year precipitation event. <br />NECC: Please see revised design for Culver 81 on page EXH. 19(24) -26. In addition, <br />pages EXH. 19(24) 22 -25 were revised due to changes in page numbers. Please see <br />revised Table 21 showing correct information for Culvert 81. <br />Division: In the SEDCAD model, flow into Culvert 81 should be for the 100 -year runoff <br />rather than the 10 -year runoff, and Table 21 should reflect this with a reference to note <br />47. Please update the SEDCAD model and Table 21. <br />The Division has performed a cost estimate for the D"A 42 Expansion and the removal of the <br />employee parking lot culverts. The total value of this estimate is $7,143.42 (see attached cost <br />estimate) compared to NECC's cost estimate of $7,559.68. The Division's cost estimate is consistent <br />with previous cost estimates approved by both the Division and NECC. If NECC wishes to use the <br />cost estimate calculated by the Division, please submit a revised estimate that matches the <br />estimate calculated by the Division. <br />NECC: Please see revised Exhibit 28, pages 258 and 259 <br />Division: Response is sufficient. <br />8. Please submit a revised page 2.05 -11 through 2.05 -11a, Table 20 -Ditch Data and 2.05 -14 through <br />2.05 -14a, Table 21- Culvert Sizing to incorporate changes from TR -65. <br />