Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />August 13, 2012 <br />Ron Thompson <br />New Elk Coal Company, LLC <br />122 West First Street <br />Trinidad, CO 80182 <br />Re: New Elk Mine (Permit No. C- 1981 -012) <br />Technical Revision No. 66 (TR -66) <br />Third Adequacy Review <br />Dear Mr. Thompson: <br />COLORADO <br />Q I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />The Division has completed a preliminary review of the TR -66 application and has the following comments. <br />1. Please provide a description on how the proposed Haul Road to the RDA will be used in support of <br />the post mining land use, as defined in Section 1.04(71), per Rule 4.03. l (f)(i). The Division feels that <br />in order for the proposed Haul Road to remain post mining, it must provide practical use in <br />conjunction with its post mining land use. <br />NECC: Permit Map -15 shows that the road used to access the RDA is an approved part of the post <br />mining land use. Therefore, no justification is necessary as the road is already- part of the approved <br />post mining land use. <br />Division: Response is sufficient. <br />Please provide a letter from the legal or equitable landowner that would request the <br />proposed Haul Road to remain left open for further use post mining as required by Rule <br />4.03. 1 (f)(ii). <br />NECC: As stated in response to questionl, the road is already an approved part of the post mining <br />land use and therefore a letter should not be required. <br />Division: Response is sufficient. <br />It is unclear on whether the proposed Haul Road design width is appropriate for the overall <br />size of vehicles and volume of traffic. The typical Remote and RDA Haul Road cross <br />section found on Map 1 -Sheet 1 shows the Haul Road having a 10 foot minimum width. <br />Please provide a description on how this width will be suitable for the anticipated traffic or <br />if additional construction of the Haul Road will be needed to attain appropriate width as per <br />Rule 4.03.1(3)(c). <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />