LT-W-11 M-11e <br />I1) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Geomembrane Exposure <br />Existing Phase 5 geomembrane was exposed using a CAT 312 excavator, a John Deere 35D <br />excavator, and laborers, preparing for berm raise construction and berm raise geomembrane tie - <br />in. An AMEC field representative observed geomembrane exposure. <br />C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation for the Phase 5 Berm Raise project. <br />AMEC observed site grading for the Phase 5 Berm Raise project. <br />AMEC observed exposure of existing geomembrane for the Phase 5 Berm Raise project <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Compact subgrade preparing for future SLF placement for the Phase 5 Berm Raise project. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on June 19, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />P56R.Weekly Report WE 06.23.2012 <br />