My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-09_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-08-09_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:04:53 PM
Creation date
8/10/2012 2:31:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/9/2012
Doc Name
CQA REPORT
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Wilms <br />PHASE 5 BERM RAISE FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 Berm Raise <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 Berm Raise <br />Date: June 23, 2012 <br />Reporting Period: 6/17/2012 through 6/23/2012 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D- <br />D = Day Shift N = Night Shift <br />Project No.: 74201125KO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 41 OF to 54 °F ( + / -) High: 65 °F to 83 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: None <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) Subgrade Preparation <br />A CAT 345 excavator with a vibratory plate compactor attachment was used to compact <br />subgrade. This was performed to prepare for future soil liner fill placement. <br />B) Select Structural Fill Placement <br />No work performed during the week. <br />C) Slope Contouring <br />Slope contouring was performed CAT 330 excavator. Material generated during slope contouring <br />was stockpile at the top of the slope. <br />D) Site Grading <br />A CAT D -6 dozer and a John Deere 35D excavator were used to perform site grading leveling the <br />ore surface in the area. A basin filled with coarse drainage material was constructed to allow for <br />solution to percolate into a deeper area of ore. This was also performed to move material to allow <br />for existing geomembrane exposure. <br />E) Soil Liner Fill (SLF) <br />No work performed during the week. <br />F) Drain Cover Fill (DCF) <br />No work performed during the week. <br />P5BR.Weekly Report WE 06.23.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.