Laserfiche WebLink
File No. CO5000-0375 <br /> 4th Quarter 1997 Report <br /> Page 2 <br /> American Tunnel Bulkhead <br /> The American Tunnel bulkhead was inspected, gage pressure readings taken, and fluid samples <br /> analyzed for pH, conductivity, and temperature more frequently than the requirements of Items 3. <br /> and 4. in the Rule Authorization letter. This information is attached. <br /> The American Tunnel bulkhead valve has remained closed since September 9, 1996. <br /> Site inspections have not revealed any indication that the bulkhead is performing other than as <br /> designed. <br /> Injection Quantities <br /> No injection of alkaline material or water occurred during the 4th quarter of 1997. <br /> Please contact me if you have any questions on this report. <br /> Sincerely, <br /> Larry Perino <br /> Reclamation Manager <br /> cc: Sarah Johnson, CDPHE <br /> Wally Erickson, DMG <br /> LPAf <br />