Laserfiche WebLink
999 <br /> SUNNYSIISE GOLD CORPOnATION <br /> AN ECHO 8AY COMPANY <br /> P.O. Box 177 -Silverton, CO 81433 <br /> Phone (303) 387-5533 -Telecopy (303) 387-5310 <br /> RECEIVED Received <br /> JAN 22 1998 t� <br /> t rN i JJ <br /> Division of Minerals&Geology Durango Fleld Office <br /> October 16, 1997 Division of Minerals&Geology <br /> Attention: Ron Zdyb DENVER OFFICE <br /> Mail Code: 8D2-W-GW <br /> U.S. Environmental Protection Agency 4'V PUBLIC FILE COPY <br /> Underground Injection Control (UIC) ILE: fil-7 7- 3'78 <br /> 999 18th Street, Suite 500 <br /> Denver, CO 80202-2466 SITE. titr <br /> RE: EPA File No. C05000-03745, San Juan County, Colorado <br /> ,Ath Quarter 1997 Report ( October- December) <br /> Dear Mr. Zdyb: <br /> In accordance with the quarterly reporting requirements of EPA's June 26, 1996 Rule <br /> Authorization letter for injection of water and alkaline material into the Sunnyside Mine, <br /> Sunnyside Gold Corporation (SGC) submits the following report. This report covers the period <br /> from October 1, 1997, through the end of the quarter, December 31,1997. <br /> Terry Tunnel Bulkhead <br /> The Terry Tunnel bulkhead valve remained closed during the 4th quarter, 1997. <br /> This site has been inaccessible for most of the 4th quarter due to snow accumulation and will <br /> remain inaccessible until around June 1, 1998. The mine pool surface was still below 11,600' <br /> elevation on December 31, 1997 therefore, bulkhead pressure should be at 8 psi. <br /> �a. <br />